Looking to the future ……
Sergio Valditerra succeeded in developing an even more innovative train in 1989 known as the “Pony”. An amazingly fast, compact and versatile train which served to further enhance the standing of the already prestigious “Valditerra system track renewal train”.
The Pony has the capacity for either re-laying or constructing a railway line from scratch.
Information technology has also been widely applied in this field, ensuring that the newly constructed or relayed line, is perfectly laid, with the minimum labour input.
Thanks to the high safety levels, certified to quality standard, the laying of the HS Rome- Naples line reached levels of 1300 metres of track laid in a single 8-hour shift, using only 12 men, the constant average maintained always being of 864 metres of finished track.
The Pony train has reached such highly rationalized automated operating levels that it is able to ensure the greatest safety and performance levels in shifts of only 2 hours.
Up to date, it has been unrivalled in all aspects.

Valditerra: ongoing innovation, research and know-how.
The Valditerra company is now in its third generation, and its classification as a “railway construction” company, is hardly worthy of it. Over the past seventy years, thanks to the renown and acclaim of its operations both on the domestic and international markets and its proven know-how and innovative capacity; it is now synonymous with excellence, both in terms of research and as a point of reference for the operators in the field.
Those in the sector seeking a point of reference in terms of high safety standards in the railway construction field in fact, cannot but look to the “Valditerra system track renewal train”, and all the related know-how that it has generated.
The Rome-Naples HS line.