The need for the large scale construction of a High speed line, to the most stringent specifications, considerable limitations and to rigid time line; were challenges which the Valditerra Railway construction company was able to meet; thanks to its long experience in the field.
The use of all the latest technology and modern techniques, together with all the latest machinery ensured that we had no problems in meeting the stringent requirements of a high speed line.
This was the first time that the Pony Train was used for track laying; the results were excellent in terms of quality and performance, far exceeding all expectations.